We support the development of railway products at any stage of the V-cycle, from requirements definition through to final validation.
Specific development phases can be covered independently, or full responsibility can be taken for HW and SW design, including adaptation of existing products, resolution of technical blockers, and preparation for compliance with CENELEC, RAMS and EMC requirements

An electronics laboratory equipped with advanced measurement instruments is available, together with industrial space for assembling real equipment and performing stress, endurance, functional and requirements verification testing.
Outdoor facilities allow validation of trackside equipment such as switches, level crossing barriers, balises or signals under representative conditions prior to installation.
The product lifecycle is documented and coordinated with independent ISA assessment partners, enabling certification to be completed without the client needing to manage additional contracts.
